2004
  • MooreSport was registered as a new Canadian based corporation.
  • Consulting various race teams throughout North America.
  • Development began of first motorsport specific MooreSport parts.
  • Moved to our first 1500 sq ft facility with shared office space and shop space in December;
2005
img-2005-computer.jpg
  • 1st client to use our parts wins USTCC title.
  • 1st client to win in class at 25hr of Thunderhill.
  • 1st client to win overall in Polish Hill Climb championship.
  • 1st client to win North American Rally Championship overall.
  • 1st subframe released for general public use and sale.
  • 1st MooreSport purpose built chassis designed.
  • Acquisition of DMS North America suspension franchise.
2006
  • Moved to larger 4000 sq./ft. facility, facility with dedicated offices, storage and production areas
  • 1st Distributors in Australia and Europe appointed.
  • Customers winning titles in NASA, Redline Time Attack, CARS, USRC in North America.
  • First customers in GT racing and WRC spec cars overseas.
  • 1st full time employee.
  • 1st MooreSport purpose built chassis designed and built in-house.
img-2006-frame.jpg
2007
img-2005-computer.jpg
  • Private Label manufacturing clients place 1st order.
  • Full time fabrication and welding department installed.
  • Acquisition of 1st Rapid Prototype 3D printer.
  • Delivered 1st complete front and rear suspension package designed and manufactured at MooreSport.
  • Involvement with factory Subaru race team in United States
2008
  • Launch of our first professional website platform as steady customer demand increases sales and production.
  • Large range of street products launched derived from motorsport based designs and knowledge.
img-2008-msi.jpg
2009
img-2009-computer.jpg
  • 1st CNC machine to arrive in house. DMG DMU-50 5-axis mill.
  • 3rd Full time employee to join our team
  • Several new street and motorsport products introduced.
  • Distribution network expands throughout Europe, Asia, and the Caribbean.
2010
  • Acquisition of adjacent 1500 sq./ft. unit to move welding and fabrication into dedicated work department.
  • 1st client to win the track records in time attack challenge.
  • 1st customer spec WRC client.
2010
2011
2011 Yokohama
  • 1st client to win World Time Attack challenge.
2012
  • 2nd CNC machine to arrive. DMG CTX-510 Turning Center.
2012
2013
2013 Logo
  • Unveiling of current logo
2014
  • 3D scanner and 3rd CNC Machine to arrive.
  • New software and employee contributions allow full integration and design of chassis dynamics and improved 5-axis milling techniques.
2014 Scanner
2015
2015 box
  • Facilities have grown to 9500 sq./ft with dedicated design, fabrication, setup, machining and composite departments
  • 9 Full Time employees with clients and championship worldwide
  • Large distribution network with select few wholesalers.
2016
  • Arrival of new cutting edge DMGMORI NLX 1500SY with CELEOS technology to increase production on small sized, high volume parts like aluminum and titanium fasteners.
2014 Scanner

Scroll To Top